Brett Aggregates, are currently utilising this Bundie Bowser at their Wembley rail head. This rail head supplies Capital Concretes’ Wembley plant which has a capacity of 300m3/hr (wet only) and is located next to the Neasden Rail Siding. Making full use of this location, most of the plant’s raw materials are bought in by train which reduces the number of vehicle movements on the road - decreasing the site’s carbon footprint. This static Bundie Bowser acts as a service centre for the site—safely housing the plants’ Diesel & AdBlue ready to be used in their machinery and equipment.
This Bundie Bowser is fully lockable and fully bunded making it both safe against unauthorised access as well as for the environment. Skid mounted and complete with lifting points, it can also be transported and positioned safely using a crane or suitable telehandler.
Under the lid you will find two 110V pumps (one for diesel, one for AdBlue) and hose reels in order to easily manage longer lengths of hose.
The AdBlue tank is manufactured from stainless steel and is fitted with a TODO coupling for quick fill purposes whilst the diesel tank is manufactured from 4mm steel and is complete with two 2inch caps for filling and venting. Gary Langton, Operations Manager (London & Home Counties) at Brett Aggregates says “this Bundie Bowser is a perfect addition to the plant as both our Diesel and AdBlue is stored in one safe and secure place”