Step 1: Track Sawing
We cut form the perimeter of the 3.0m x 3.0m opening using the Tryolit WSE Track Saw.
Step 2: Stitch Drilling
We then stitch drilled the corners with the Husqvarna DM 340 Drill Rig and Motor. This was to prevent overcutting at the end of the cuts.
Step 3: Breaking Out
We were then ready to break out the concrete using Demolition Robot Husqvarna DXR145.