Construction Index TV

22 December 2024

Related Information

Installing the new Oder Bridge

The original Oder railway bridge, on the German-Polish border in Küstrin, was built more than 100 years ago. It has now been replaced by an innovative network arch bridge with carbon hangers.

The 2,100-tonne, 180-metre long structure was installed by Dutch heavy-lift specialist Mammoet.

Video uploaded on 07/03/2024 12:00am. Click here to read more about this video

Embed this video on your site:
Previous Page